Client: EnerDry A/S
Object: Sugar production plant in the United Kingdom
Year: 2025-2026
Scope of works:
Installation of two gigantic EnerDry units, one of which is almost 22 meters high and weighs up to 350 tones, comprising:
- Design: Design of the external structures of the plants.
- Supply: Ordering the necessary components from reliable manufacturers.
- Manufacturing: Fabrication of the external structures from steel.
- Transportation: Transportation of giant structures by sea and land.
- Assembly: Assembly of the external structures of the units.
- Installation: Installation of the internal equipment.
