Manufacture and installation of two sugar pulp drying units

Client: EnerDry A/S

Object: Sugar production plant in the United Kingdom

Year: 2025-2026

Scope of works:

Installation of two gigantic EnerDry units, one of which is almost 22 meters high and weighs up to 350 tones, comprising:

  • Design: Design of the external structures of the plants.
  • Supply: Ordering the necessary components from reliable manufacturers.
  • Manufacturing: Fabrication of the external structures from steel.
  • Transportation: Transportation of giant structures by sea and land.
  • Assembly: Assembly of the external structures of the units.
  • Installation: Installation of the internal equipment.