Client: FLSmidth Airtech A/S
Object: Pulp mill in Scandinavia.
Year: 2025
Scope of works:
Full electrostatic precipitator renovation consisting of:
- Preparation: Building of a temporary platform and cutting of a 3 x 3 meter hole.
- Dismantling: Dismantling of all worn-out equipment.
- Cleaning: Cleaning of the electrostatic precipitator housing.
- Installation: Installation of new equipment such as collector plates, high voltage electrodes, rapping system.
