Client: Gren Klaipėda
Object: Heat and electricity generating thermal power plant in Klaipėda
Year: 2024-2025
Scope of works:
Overhaul of a Sulzer multi-stage centrifugal pump consists of:
- Diagnostics: Determining what repair work needs to be done and which components need to be replaced.
- Supply: Ordering all spare parts from reliable manufacturers.
- Repair: Replacing worn components and performing repair work.
- Hydraulic testing: Assembling the industrial pump and testing it by performing a hydraulic test.