Client: “Mestilla” UAB
Object: New biodiesel plant under construction in the Klaipėda FEZ
Year: 2026
Scope of works:
The installation of the electrical and automation (E/A) components of the process equipment consisted of:
- Installation: approximately 90 kilometers of cables were laid, more than 800 measuring instruments were installed, and cable routes, electrical cabinets, junction boxes, safety switches, and control stations were set up.
- Cold commissioning: tests were performed to start up the equipment without power
- Preparation of technical documentation: preparation of all necessary documents