Client: Okseta UAB
Object: Petrašiūnai power plant and Pergalės boiler house owned by Kauno Energija
Year: 2024-2025
Scope of works:
Reconstruction of the Petrašiūnai power plant pumping station consisted of:
- Dismantling of redundant E/A panels, electrical equipment and cables;
- Installation of modern electrical-automation equipment;
- Connection of new equipment into a single SCADA process control and visualization system;
- Cold commissioning works.
The reconstruction of the Pergalė boiler house’s electrical switchgear and the installation of a new generator was carried out in three phases:
- Installation of two pumps, cables, cable structures and frequency converters;
- Control system upgrade and programming of the Automatic Standby Unit (ASU);\
- Programming of the ASU;
- Connection of the generator and new electrical section.