1. Home
  2. /
  3. Energetics
  4. /
  5. Installation of absorbtion heat pump with a second-stage flue gas condensing economizer

Installation of absorbtion heat pump with a second-stage flue gas condensing economizer

Client: Klaipėdos energija AB

Object: District boiler house in Klaipėd

Year: 2020-2022

Scope:

  • Building and equipment design
  • Installation of required equipment and materials
  • Preparation of the technical work design
  • Building construction
  • Supply of the absorption heat pump and flue gas condensing economizer
  • Equipment installation
  • Commissioning and adjustment works

Read more

Naudoti produktai