{"id":8523,"date":"2025-11-05T09:12:31","date_gmt":"2025-11-05T07:12:31","guid":{"rendered":"https:\/\/axs.eu\/?p=8523"},"modified":"2026-03-26T14:32:40","modified_gmt":"2026-03-26T12:32:40","slug":"construction-has-begun-on-an-80-megawatt-energy-storage-facility-in-the-panevezys-district","status":"publish","type":"post","link":"https:\/\/axs.eu\/en\/projects\/construction-has-begun-on-an-80-megawatt-energy-storage-facility-in-the-panevezys-district","title":{"rendered":"Construction has begun on an 80-megawatt energy storage facility in the Panev\u0117\u017eys district"},"content":{"rendered":"<p>Axioma Servisas, a provider of engineering services, has launched a project to construct an energy storage facility for UAB Aruno BESS. An 80 MW, 160 MWh energy storage park is being built in the village of Bli\u016bd\u017eiai, Panev\u0117\u017eys District, which will be integrated into the electricity transmission grid. Once the project is completed, the park will contribute to balancing electricity generation in the Baltic balancing market and strengthen Lithuania\u2019s energy independence.<\/p>\n<p>\u201cAxioma Servisas\u201d is carrying out all project implementation work\u2014from site preparation, equipment supply, and installation to system integration, testing, and commissioning. The company will also be responsible for the technical maintenance and servicing of the energy storage park.<\/p>\n<p>The project is scheduled for completion in the third quarter of 2026.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-6907\" src=\"https:\/\/axs.eu\/wp-content\/uploads\/2025\/10\/naujos-kartos-lietuva-logo-300x107.png\" alt=\"\" width=\"264\" height=\"94\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-6905\" src=\"https:\/\/axs.eu\/wp-content\/uploads\/2025\/10\/ES-finansuoja-300x77.jpg\" alt=\"\" width=\"300\" height=\"77\" srcset=\"https:\/\/axs.eu\/wp-content\/uploads\/2025\/10\/ES-finansuoja-300x77.jpg 300w, https:\/\/axs.eu\/wp-content\/uploads\/2025\/10\/ES-finansuoja-1024x263.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Axioma Servisas, a provider of engineering services, has launched a project to construct an energy storage facility for UAB Aruno BESS. An 80 MW, 160 MWh energy storage park is being built in the village of Bli\u016bd\u017eiai, Panev\u0117\u017eys District, which will be integrated into the electricity transmission grid. Once the project is completed, the park&#8230;<\/p>\n","protected":false},"author":3,"featured_media":6926,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[136],"tags":[],"class_list":["post-8523","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/posts\/8523","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/comments?post=8523"}],"version-history":[{"count":1,"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/posts\/8523\/revisions"}],"predecessor-version":[{"id":8524,"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/posts\/8523\/revisions\/8524"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/media\/6926"}],"wp:attachment":[{"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/media?parent=8523"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/categories?post=8523"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/axs.eu\/en\/wp-json\/wp\/v2\/tags?post=8523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}